top of page
Marbas Logo

DP World, Pre-Gate & Truck Park, Southampton

Marbas completed the structural and civil engineering design for the DP World Southampton Pre-gate & Truck Park. The site covered 42,000 m2 of land on Southampton Dock. The project required Marbas designed structural canopies, 9,000m2 of concrete slabs, Surfacing works and more

Sector:

Marine

Client:

DP World

Project Value:

£15m

Year Completed:

2025

bottom of page